RAF Fulbeck Wind Farm – S15/1764

Planning application – S15/1764

Proposal: Erection, 25 year operation and subsequent de-commissioning of a wind farm consisting of 10 wind turbines (each up to 110m to the blade tip) and associated infrastructure, including underground cable connections.